WOODWARD CANYON RD over WOODWARD CANYON

02.391N SR 12 · County 071, Washington · Built 1994 · 2 Lanes · 130 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
086083000000000
Year Built
1994
Length
10.1 m (33.1 ft)
Max Span
9.8 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
130
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$776,000
Total Project Cost
$1,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.