S ALBRO PL over AIRPORT WAY S RR
S Albro Pl & Airport Way · County 033, Washington · Built 1931 · 4 Lanes · 13,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
47.5474, -122.314033
This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 95 years old.
Nearby Bridges
RAMP TO I-5 NB/SB over CITY STS RAMP & RR
Built 1966
S-ALBRO RAMP over TERRAIN
Built 1966
ALBRO ST over I-5
Built 1966
E-N RAMP over I-5
Built 1966
I-5 over TERRAIN
Built 1969
I-5 over N-W RAMP
Built 1966
I-5 S-W N-W RAMPS over AIRPORT WAY
Built 1967
N-W RAMP over RAILROAD
Built 1967
I-5 over LUCILE ST
Built 1966
I-5 over LUCILE ST
Built 1966
Bridge Details
- Structure #
- 085342000000000
- Year Built
- 1931
- Length
- 172.2 m (565 ft)
- Max Span
- 28.7 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 4
- Daily Traffic
- 13,000
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $12,430,000
- Total Project Cost
- $15,538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.