19TH AVENUE over CID CANAL

.40 W WASHINGTON · County 005, Washington · Built 1971 · 2 Lanes · 2,601 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
085171000000000
Year Built
1971
Reconstructed
1994
Length
7.3 m (24 ft)
Max Span
7.1 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
2,601
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$614,000
Total Project Cost
$1,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.