SR 397 over BNSF RR
16.5 N JCT I-82 · County 005, Washington · Built 1965 · 2 Lanes · 11,820 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.198556, -119.090944
This bridge is in worse condition than 58.1% of bridges in County 005. The average bridge in Washington is 0 years old; this one is 61 years old.
Nearby Bridges
BERNATH ROAD over CID CANAL
Built 1970
WASHINGTON STREET over CID CANAL
Built 1967
WASHINGTON STREET over CID CANAL
Built 1971
SR 397 over COLUMBIA RIVER
Built 1978
AUBURN STREET over CID CANAL
Built 1969
19TH AVENUE over CID CANAL
Built 1971
SR 397 / AINSWORTH over SOUTH 4TH AVE / BNSF RR
Built 2007
E 36TH STREET over CID CANAL
Built 1971
DAYTON STREET over CID CANAL
Built 2014
W 1ST AVENUE over C.I.D. CANAL
Built 1956
Bridge Details
- Structure #
- 085664000000000
- Year Built
- 1965
- Reconstructed
- 1995
- Length
- 80.3 m (263.5 ft)
- Max Span
- 24.7 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 11,820
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,628,000
- Total Project Cost
- $5,257,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.