WEST PARKER HEIGHT over S.V.I.D. CANAL
00.06 N YAK VAL HWY · County 077, Washington · Built 1919 · 2 Lanes · 400 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
46.483528, -120.401692
This bridge is in worse condition than 98% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 107 years old.
Nearby Bridges
DONALD RD over I-82
Built 1980
I-82 over MELLIS ROAD
Built 1980
I-82 over MELLIS ROAD
Built 1981
DONALD WAPATO RD. over YAKIMA RIVER
Built 2004
YAKIMA VALLEY HWY over S.V.I.D. CANAL
Built 1953
KONNOWAC PASS RD over SVID CANAL
Built 2003
I-82 over COUNTY ROAD AND CANAL
Built 1979
I-82 over COUNTY ROAD AND CANAL
Built 1979
US 97 over LATERAL NO. 1
Built 1959
DONALD-WAPATO RD. over DRAIN
Built 1960
Bridge Details
- Structure #
- 084808000000000
- Year Built
- 1919
- Length
- 35.7 m (117.1 ft)
- Max Span
- 35.1 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,292,000
- Total Project Cost
- $4,585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.