I-82 over MELLIS ROAD
4.7 E JCT US 97 · County 077, Washington · Built 1980 · 2 Lanes · 14,654 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.489253, -120.422486
This bridge is in worse condition than 58.9% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 46 years old.
Nearby Bridges
I-82 over MELLIS ROAD
Built 1981
YAKIMA VALLEY HWY over S.V.I.D. CANAL
Built 1953
I-82 over COUNTY ROAD AND CANAL
Built 1979
I-82 over COUNTY ROAD AND CANAL
Built 1979
WEST PARKER HEIGHT over S.V.I.D. CANAL
Built 1919
US 97 over LATERAL NO. 1
Built 1959
DONALD RD over I-82
Built 1980
PARKER BRIDGE RD over YAKIMA RIVER
Built 1999
DONALD WAPATO RD. over YAKIMA RIVER
Built 2004
I-82 over THORP RD
Built 1980
Bridge Details
- Structure #
- 0011366A0000000
- Year Built
- 1980
- Length
- 30.8 m (101 ft)
- Max Span
- 29.3 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 14,654
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $960,000
- Total Project Cost
- $1,919,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.