DONALD-WAPATO RD. over DRAIN
01.98 S YAK VAL HWY · County 077, Washington · Built 1960 · 2 Lanes · 5,040 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
46.453378, -120.413319
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 66 years old.
Nearby Bridges
DONALD WAPATO RD. over YAKIMA RIVER
Built 2004
US 97 over LATERAL 2 IRR. CANAL
Built 1991
US 97 over LATERAL 2 IRR. CANAL
Built 1991
DONALD RD over I-82
Built 1980
MCKINLEY RD. N. over USIS CANAL
Built 1970
TRACK RD. N. over USIS CANAL
Built 1961
US 97 over LATERAL NO. 1
Built 1959
WEST PARKER HEIGHT over S.V.I.D. CANAL
Built 1919
HIGGINS LANE over WAPATO CANAL
Built 1977
Yakima Valley Hwy over Overflow Canal
Built 2015
Bridge Details
- Structure #
- 081275000000000
- Year Built
- 1960
- Length
- 9.8 m (32.2 ft)
- Max Span
- 3.4 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 5,040
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $758,000
- Total Project Cost
- $1,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.