OLSON RD/36 AVE NW over NORMAN SLOUGH
0.1 S JCT SR 530 · County 061, Washington · Built 1979 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
48.222594, -122.2808
This bridge is in worse condition than 84.4% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 47 years old.
Nearby Bridges
PIONEER HIGHWAY over STILLIGUAMISH RIVER
Built 1979
LARSON RD over SO SLOUGH STILLAGUAMISH
Built 1963
I-5 over SR 532/268TH ST NE
Built 1957
I-5 over SR 532 / 268TH ST NE
Built 1971
NORMAN RD over STILLAGUAMISH RIVER
Built 1963
SR 532 over CHURCH CREEK
Built 2017
PIONEER HIGHWAY over STILLAGUAMISH RIVER
Built 1998
HEVLY RD over KOCHS SLOUGH FLOODWAY
Built 1981
HEVLY RD over STILLAGUAMISH SLOUGH
Built 2005
MARINE DRIVE over STILLAGUAMISH RIVER
Built 1959
Bridge Details
- Structure #
- 084574000000000
- Year Built
- 1979
- Length
- 49.6 m (162.7 ft)
- Max Span
- 5.3 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,117,000
- Total Project Cost
- $6,234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.