BRIDGE CR ROAD over SAN POIL RIVER
00.2 E JCT SR 21 · County 019, Washington · Built 1960 · 2 Lanes · 290 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.228389, -118.699142
This bridge is in worse condition than 45.5% of bridges in County 019. The average bridge in Washington is 0 years old; this one is 66 years old.
Bridge Details
- Structure #
- 084167000000000
- Year Built
- 1960
- Length
- 33.5 m (109.9 ft)
- Max Span
- 13.4 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 290
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $836,000
- Total Project Cost
- $1,672,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.