BRIDGE CR ROAD over SAN POIL RIVER

00.2 E JCT SR 21 · County 019, Washington · Built 1960 · 2 Lanes · 290 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

48.228389, -118.699142

This bridge is in worse condition than 45.5% of bridges in County 019. The average bridge in Washington is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
084167000000000
Year Built
1960
Length
33.5 m (109.9 ft)
Max Span
13.4 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
290
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$836,000
Total Project Cost
$1,672,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.