SR 21 over SAN POIL R
24.2 N LINCOLN CO · County 019, Washington · Built 1931 · 2 Lanes · 705 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.240247, -118.694642
This bridge is in worse condition than 96.4% of bridges in County 019. The average bridge in Washington is 0 years old; this one is 95 years old.
Bridge Details
- Structure #
- 0001513A0000000
- Year Built
- 1931
- Length
- 14 m (45.9 ft)
- Max Span
- 13.4 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 705
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $306,000
- Total Project Cost
- $612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.