SR 21 over SAN POIL RIVER

25.1 N LINCOLN CO · County 019, Washington · Built 1931 · 2 Lanes · 193 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 7 Good
Substructure 6 Satisfactory

Location

48.268333, -118.701317

This bridge is in worse condition than 89.1% of bridges in County 019. The average bridge in Washington is 0 years old; this one is 95 years old.

Nearby Bridges

Bridge Details

Structure #
0001513B0000000
Year Built
1931
Length
14.6 m (47.9 ft)
Max Span
13.4 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
193
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$319,000
Total Project Cost
$638,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.