ROCK CREEK ROAD over SQUAW CREEK
5.4 S JCT CR 34000 · County 039, Washington · Built 1982 · 2 Lanes · 16 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
45.796564, -120.464408
This bridge is in worse condition than 64.8% of bridges in County 039. The average bridge in Washington is 0 years old; this one is 44 years old.
Nearby Bridges
IMRIE ROAD over ROCK CREEK
Built 1965
OLD HIGHWAY 8 over ROCK CREEK
Built 1945
Bickleton Hwy over Rock Creek
Built 2009
SR 14 over ROCK CREEK
Built 1962
OAK FLAT ROAD over LUNA CREEK
Built 1981
PHILLIPI CANYON RD over I-84 (HWY 002)
Built 1964
OLD MOUNTAIN ROAD over BADGER GULCH
Built 1977
I-84 (HWY 002) over BLALOCK CANYON RD
Built 1964
SHRANTZ ROAD over WOOD GULCH CREEK
Built 1975
I-84 (HWY 002) over JOHN DAY RIVER
Built 1963
Bridge Details
- Structure #
- 083981000000000
- Year Built
- 1982
- Length
- 18.6 m (61 ft)
- Max Span
- 17.1 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 16
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,282,000
- Total Project Cost
- $2,563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.