I-84 (HWY 002) over BLALOCK CANYON RD

149 MI E SHERMAN GILL CLN · County 021, Oregon · Built 1964 · 4 Lanes · 14,269 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
08945 002 12943
Year Built
1964
Length
47.9 m (157.2 ft)
Max Span
17.1 m
Width
23.7 m (77.8 ft)
Lanes
4
Daily Traffic
14,269
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.