SHRANTZ ROAD over WOOD GULCH CREEK
1.2 E Jct CR 38000 · County 039, Washington · Built 1975 · 2 Lanes · 51 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
45.864883, -120.3221
This bridge is in worse condition than 64.8% of bridges in County 039. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
EAST ROAD over PINE CREEK
Built 1972
Roosevelt Grade Rd over Wood Gulch Haul Road
Built 2001
ROCK CREEK ROAD over SQUAW CREEK
Built 1982
MATSEN RD over ALDER CREEK
Built 1996
MIDDLE ROAD over PINE CREEK
Built 1959
BICKLETON HWY over PINE CREEK
Built 1978
IMRIE ROAD over ROCK CREEK
Built 1965
OLD HIGHWAY 8 over ROCK CREEK
Built 1945
SR 14 over WOOD GULCH CR
Built 1958
Bridge Details
- Structure #
- 080153000000000
- Year Built
- 1975
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.3 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 51
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $213,000
- Total Project Cost
- $426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.