FACTORY ROAD over Black Creek
00.16 E FERSON ROAD · County 077, Washington · Built 1961 · 2 Lanes · 1,075 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.317, -119.942614
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 65 years old.
Nearby Bridges
FACTORY ROAD over SVID CANAL
Built 1969
EDISON RD E. over SVID CANAL
Built 2001
ALLEN RD. E. over BLACK CREEK
Built 1958
EDISON RD. E. over DRAIN
Built 1976
SHELLER RD. over SVID CANAL
Built 2004
ALEXANDER RD. E. over BLACK CREEK
Built 1958
BETHANY ROAD over SVID CANAL
Built 1967
EDISON RD. E. over SULPHER CREEK WASTEWAY
Built 1978
SR 241 over I-82
Built 1981
FACTORY ROAD over SULPHER CREEK WASTEWAY
Built 1973
Bridge Details
- Structure #
- 083811000000000
- Year Built
- 1961
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,075
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $614,000
- Total Project Cost
- $1,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.