EDISON RD E. over SVID CANAL

0.08 W OF BRIDGEMAN · County 077, Washington · Built 2001 · 2 Lanes · 465 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
086569000000000
Year Built
2001
Length
22.6 m (74.1 ft)
Max Span
21.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
465
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,516,000
Total Project Cost
$3,032,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.