THIEL RD over WOODWARD CANYON

02.05 N SUDBURY RD · County 071, Washington · Built 1953 · 2 Lanes · 9 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
4
Poor

Bridge Details

Structure #
083517000000000
Year Built
1953
Reconstructed
2005
Length
7 m (23 ft)
Max Span
6.7 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
9
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$596,000
Total Project Cost
$1,191,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.