THIEL RD over WOODWARD CANYON
02.05 N SUDBURY RD · County 071, Washington · Built 1953 · 2 Lanes · 9 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 4 | Poor |
Location
46.145261, -118.530808
This bridge is in worse condition than 90.8% of bridges in County 071. The average bridge in Washington is 0 years old; this one is 73 years old.
Nearby Bridges
SUDBURY RD over DRY RUN
Built 2023
NELMS RD over WOODWARD CANYON
Built 1994
GUY FINE RD over DRY CREEK
Built 1992
SUDBURY RD over DRY CREEK
Built 1973
LOWER DRY CREEK RD over MUD CREEK
Built 1991
WOODWARD CANYON RD over WOODWARD CANYON
Built 1994
TALBOTT RD over DRY CREEK
Built 1997
LUCKENBILL RD over DRY RUN
Built 2012
SIMS RD over TOUCHET RIVER
Built 1990
TOUCHET NORTH RD over TOUCHET RIVER
Built 1983
Bridge Details
- Structure #
- 083517000000000
- Year Built
- 1953
- Reconstructed
- 2005
- Length
- 7 m (23 ft)
- Max Span
- 6.7 m
- Width
- 7.2 m (23.6 ft)
- Lanes
- 2
- Daily Traffic
- 9
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $596,000
- Total Project Cost
- $1,191,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.