FACTORY ROAD over ROZA CANAL
00.14 W OF WEBSTER · County 077, Washington · Built 1987 · 2 Lanes · 820 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.316825, -119.892644
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 39 years old.
Nearby Bridges
SHELLER ROAD over ROZA CANAL
Built 1970
COUNTY LINE ROAD over ROZA CANAL
Built 1978
WILSON HIGHWAY over SVID CANAL
Built 1969
EDISON RD. E. over DRAIN
Built 1976
FACTORY ROAD over SVID CANAL
Built 1969
BETHANY ROAD over SVID CANAL
Built 1967
GRIFFIN ROAD over ROZA CANAL
Built 1981
EDISON RD E. over SVID CANAL
Built 2001
FACTORY ROAD over Black Creek
Built 1961
SHELLER RD. over SVID CANAL
Built 2004
Bridge Details
- Structure #
- 083313000000000
- Year Built
- 1987
- Length
- 18.6 m (61 ft)
- Max Span
- 18 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 820
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,282,000
- Total Project Cost
- $2,563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.