E.2 RD SW over WEST CANAL
E.3 .3 S of Frenchman · County 025, Washington · Built 1959 · 2 Lanes · 59 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
46.968203, -119.607447
This bridge is in worse condition than 87.2% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 67 years old.
Nearby Bridges
D RD SW over IRRIGATION LATERAL
Built 1959
E RD SW over IRRIGATION LATERAL
Built 1953
G RD SW over WEST CANAL
Built 2006
MAINTENANCE ROAD over WEST CANAL
Built 1956
FRENCHMAN HILLS RD over WEST CANAL TUNNEL WW
Built 1962
DODSON ROAD over WEST CANAL BLK 86
Built 1993
I SW over WEST CANAL
Built 1951
I RD SW over WEST CANAL
Built 1956
J RD SW over IRRIGATION LATERAL
Built 1964
A RD SW over IRRIGATION LATERAL
Built 1954
Bridge Details
- Structure #
- 082319000000000
- Year Built
- 1959
- Length
- 16.8 m (55.1 ft)
- Max Span
- 9.1 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 59
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,173,000
- Total Project Cost
- $2,346,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.