I SW over WEST CANAL

I SW .02 S of Frenchmen · County 025, Washington · Built 1951 · 2 Lanes · 59 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
081016000000000
Year Built
1951
Length
26.2 m (86 ft)
Max Span
8.8 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
59
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,733,000
Total Project Cost
$3,466,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.