I SW over WEST CANAL
I SW .02 S of Frenchmen · County 025, Washington · Built 1951 · 2 Lanes · 59 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.980972, -119.6851
This bridge is in worse condition than 65.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 75 years old.
Nearby Bridges
FRENCHMAN HILLS RD over WEST CANAL TUNNEL WW
Built 1962
K SW S of 7 SW over WEST CANAL
Built 1951
J RD SW over IRRIGATION LATERAL
Built 1964
MAINTENANCE ROAD over WEST CANAL
Built 1956
I RD SW over WEST CANAL
Built 1956
G RD SW over WEST CANAL
Built 2006
FRENCHMAN HILLS RD over WEST CANAL
Built 1987
L ROAD SW over LAT. W61C BLK 81
Built 1964
ADAMS ROAD over WEST CANAL BLK 78
Built 1994
M RD SW over IRRIGATION LATERAL
Built 1958
Bridge Details
- Structure #
- 081016000000000
- Year Built
- 1951
- Length
- 26.2 m (86 ft)
- Max Span
- 8.8 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 59
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,733,000
- Total Project Cost
- $3,466,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.