FRENCHMAN HILLS RD over WEST CANAL TUNNEL WW
Frenchmen Hill 1.2 E of I · County 025, Washington · Built 1962 · 2 Lanes · 368 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.977606, -119.661783
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 64 years old.
Nearby Bridges
I SW over WEST CANAL
Built 1951
MAINTENANCE ROAD over WEST CANAL
Built 1956
G RD SW over WEST CANAL
Built 2006
E.2 RD SW over WEST CANAL
Built 1959
J RD SW over IRRIGATION LATERAL
Built 1964
I RD SW over WEST CANAL
Built 1956
K SW S of 7 SW over WEST CANAL
Built 1951
E RD SW over IRRIGATION LATERAL
Built 1953
11 ROAD SW over ROYAL BRANCH CANAL BLK82
Built 1987
D RD SW over IRRIGATION LATERAL
Built 1959
Bridge Details
- Structure #
- 081340000000000
- Year Built
- 1962
- Length
- 15.8 m (51.8 ft)
- Max Span
- 14.6 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 368
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,119,000
- Total Project Cost
- $2,238,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.