DYCK RD over ROCKY COULEE

02.02 MI S DAVIS · County 001, Washington · Built 2002 · 2 Lanes · 7 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

47.231636, -118.79355

This bridge is in worse condition than 10.7% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 24 years old.

Nearby Bridges

Bridge Details

Structure #
081927000000000
Year Built
2002
Length
10.1 m (33.1 ft)
Max Span
9.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
7
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$776,000
Total Project Cost
$1,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.