SCHOESSLER RD over DRY WASH
01.00 MI E MOODY · County 001, Washington · Built 1961 · 2 Lanes · 15 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
47.159003, -118.892731
This bridge is in worse condition than 36.4% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 65 years old.
Nearby Bridges
ROSENOFF RD over INTERMITTENT STREAM
Built 1920
ROSENOFF RD over FARRIER COULEE
Built 1920
BATUM RD over YORK COULEE
Built 1979
HEINEMANN RD over FARRIER COULEE
Built 1900
MOODY RD over ROCKY COULEE
Built 1967
DEAL RD over FARRIER COULEE
Built 1989
KOCH RD over FARRIER COULEE
Built 1973
I-90 over FARRIER COULEE
Built 1972
I-90 over FARRIER COULEE
Built 1972
I-90 over DEAL RD
Built 1972
Bridge Details
- Structure #
- 080047000000000
- Year Built
- 1961
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.5 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 15
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $632,000
- Total Project Cost
- $1,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.