I-90 over FARRIER COULEE

4.7 E GRANT CO · County 001, Washington · Built 1972 · 2 Lanes · 5,952 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

47.087339, -118.880794

This bridge is in worse condition than 10.7% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 54 years old.

Nearby Bridges

Bridge Details

Structure #
0009144C0000000
Year Built
1972
Length
53 m (173.9 ft)
Max Span
21.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
5,952
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,653,000
Total Project Cost
$3,306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.