I-90 over DEAL RD
5.0 E GRANT CO · County 001, Washington · Built 1972 · 2 Lanes · 5,952 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.087275, -118.874892
This bridge is in worse condition than 10.7% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 54 years old.
Nearby Bridges
I-90 over DEAL RD
Built 1972
KOCH RD over FARRIER COULEE
Built 1973
I-90 over FARRIER COULEE
Built 1972
I-90 over FARRIER COULEE
Built 1972
DEAL RD over FARRIER COULEE
Built 1989
DEAL RD over WEBER COULEE
Built 1989
SCHRAG RD over FARRIER COULEE
Built 1938
HEINEMANN RD over FARRIER COULEE
Built 1900
URQUHART RD over WEBER COULEE
Built 1917
SCHRAG RD over DRY WASH
Built 1938
Bridge Details
- Structure #
- 0009144F0000000
- Year Built
- 1972
- Length
- 35.1 m (115.2 ft)
- Max Span
- 33.8 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 5,952
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,147,000
- Total Project Cost
- $2,294,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.