SR 21 over DRY RUN
10.0 N JCT I-90 · County 001, Washington · Built 1965 · 2 Lanes · 182 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.226086, -118.686183
This bridge is in worse condition than 10.7% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 61 years old.
Nearby Bridges
LAUER RD over DRY RELIEF
Built 1933
LAUER RD over ROCKY COULEE
Built 1914
JANTZ RD over ROCKY COULEE
Built 1950
GRIFFITH RD over ROCKY COULEE
Built 1929
JANTZ RD over INTERMITTENT STREAM
Built 1953
DYCK RD over ROCKY COULEE
Built 2002
SCHOONOVER RD over MILWAUKEE COULEE
Built 1956
BATUM RD over ROCKY COULEE
Built 1914
SR 28 over CRAB CR
Built 1953
SR 21 over CRAB CREEK
Built 1965
Bridge Details
- Structure #
- 0007755A0000000
- Year Built
- 1965
- Length
- 28.3 m (92.8 ft)
- Max Span
- 11.3 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 182
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $707,000
- Total Project Cost
- $1,414,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.