South Loon Lake Rd over RAILROAD

00.28 W JCT SR 395 · County 065, Washington · Built 1952 · 2 Lanes · 349 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 5 Fair

Location

48.028131, -117.604675

This bridge is in worse condition than 72% of bridges in County 065. The average bridge in Washington is 0 years old; this one is 74 years old.

Nearby Bridges

Bridge Details

Structure #
081304000000000
Year Built
1952
Reconstructed
1994
Length
29.3 m (96.1 ft)
Max Span
6.4 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
349
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$1,914,000
Total Project Cost
$3,827,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.