KRAMER PARKWAY over I-90
5.7 E JCT SR 27 · County 063, Washington · Built 2023 · 2 Lanes · 1,717 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.667389, -117.122064
This bridge is in worse condition than 5.2% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 3 years old.
Nearby Bridges
I-90 WB RAMP over I-90
Built 1956
N LIBERTY LAKE RD over I-90
Built 1964
HARVARD ROAD over SPOKANE RIVER
Built 1997
BARKER RD over I-90
Built 1956
Barker Road over SPOKANE RIVER
Built 2010
FLORA RD over I-90
Built 1957
E WELLESLEY AVE over RAILROAD
Built 1963
E WELLESLEY AVE over SR 290 WB
Built 1963
BARKER RD over RR
Built 2022
SULLIVAN RD over I-90
Built 1985
Bridge Details
- Structure #
- 0019692A0000000
- Year Built
- 2023
- Length
- 77.5 m (254.3 ft)
- Max Span
- 27.3 m
- Width
- 17.3 m (56.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,717
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,356,000
- Total Project Cost
- $4,713,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.