Barker Road over SPOKANE RIVER

0.5 S EUCLID ROAD · County 063, Washington · Built 2010 · 3 Lanes · 7,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
088004000000000
Year Built
2010
Length
138.4 m (454.1 ft)
Max Span
46.6 m
Width
21.9 m (71.9 ft)
Lanes
3
Daily Traffic
7,200
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,990,000
Total Project Cost
$7,979,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.