TOTEM LAKE BLVD over TRIB TO JUANITA CR

6.0 N JCT SR 520 · County 033, Washington · Built 2023 · 2 Lanes · 24,107 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
0019573C0000000
Year Built
2023
Length
6.9 m (22.6 ft)
Max Span
6.9 m
Width
23 m (75.5 ft)
Lanes
2
Daily Traffic
24,107
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$413,000
Total Project Cost
$826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.