NE 116TH ST over RAILROAD
0.1 W I-405 · County 033, Washington · Built 2012 · 6 Lanes · 18,100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.704083, -122.181944
This bridge is in worse condition than 5% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 14 years old.
Nearby Bridges
I-405 over NE 116TH ST
Built 2006
I-405 over NE 116TH ST
Built 2007
I-405 over PEDESTRIAN TRAIL
Built 1956
I-405 over PEDESTRIAN TRAIL
Built 1970
NE 124TH ST over RAMP/120TH AVE
Built 1990
NE 124TH ST over I-405
Built 1969
NE 128TH ST over NB I-405
Built 2006
NE 128TH ST over SB I-405
Built 2006
TOTEM LAKE BLVD over TRIB TO JUANITA CR
Built 2023
I-405 over NE 132ND ST
Built 1970
Bridge Details
- Structure #
- 0018053A0000000
- Year Built
- 2012
- Length
- 39.3 m (128.9 ft)
- Max Span
- 17.7 m
- Width
- 27.7 m (90.9 ft)
- Lanes
- 6
- Daily Traffic
- 18,100
- Material
- Prestressed Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,390,000
- Total Project Cost
- $4,779,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.