I-405 over NE 132ND ST
6.1 N JCT SR 520 · County 033, Washington · Built 1970 · 6 Lanes · 69,115 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.718458, -122.187833
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 56 years old.
Nearby Bridges
116TH WAY NE over TRIB TO JUANITA CR
Built 2023
I-405 over NE 132ND ST
Built 1970
TOTEM LAKE BLVD over TRIB TO JUANITA CR
Built 2023
NE 128TH ST over SB I-405
Built 2006
NE 128TH ST over NB I-405
Built 2006
NE 124TH ST over I-405
Built 1969
NE 124TH ST over RAMP/120TH AVE
Built 1990
I-405 over PEDESTRIAN TRAIL
Built 1970
I-405 over PEDESTRIAN TRAIL
Built 1956
NE 116TH ST over RAILROAD
Built 2012
Bridge Details
- Structure #
- 0008615E0000000
- Year Built
- 1970
- Reconstructed
- 2008
- Length
- 54.9 m (180.1 ft)
- Max Span
- 21.9 m
- Width
- 31.1 m (102 ft)
- Lanes
- 6
- Daily Traffic
- 69,115
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,992,000
- Total Project Cost
- $5,985,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.