SR 162 over PUYALLUP RIVER
4.4 E JCT SR 410 · County 053, Washington · Built 2015 · 2 Lanes · 20,803 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.130178, -122.235994
This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 11 years old.
Nearby Bridges
128 ST E over PUYALLUP RIVER
Built 1987
McCUTCHEON RD E over FENNEL CREEK
Built 1951
150TH AVE E over HORSEHAVEN CREEK
Built 2023
96 ST E over PUYALLUP RIVER
Built 1985
39TH AVE SE over WILLOWS POND OVERFLOW
Built 2005
ORTING KAPOWSIN HW over PUYALLUP RIVER
Built 1997
188 ST E over HORSEHAVEN CREEK
Built 2022
SR 161 over SR 512 N-W RAMP
Built 1971
9TH ST SW/94TH AVE over SR 512
Built 1971
SR 162 over PUYALLUP RIVER
Built 1973
Bridge Details
- Structure #
- 0018685A0000000
- Year Built
- 2015
- Length
- 82.3 m (270 ft)
- Max Span
- 47.2 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 20,803
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,054,000
- Total Project Cost
- $10,108,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.