39TH AVE SE over WILLOWS POND OVERFLOW

.05 MI W JCT 5TH AVE · County 053, Washington · Built 2005 · 5 Lanes · 17,100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 8 Very Good

Location

47.153917, -122.289028

This bridge is in worse condition than 17.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
088555000000000
Year Built
2005
Length
10.1 m (33.1 ft)
Max Span
8.8 m
Width
5.8 m (19 ft)
Lanes
5
Daily Traffic
17,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$478,000
Total Project Cost
$956,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.