CHENEY SPOKANE RD over SR 195

27.7 N WHITMAN CO · County 063, Washington · Built 2014 · 2 Lanes · 5,682 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0018378A0000000
Year Built
2014
Length
68.9 m (226 ft)
Max Span
33.8 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
5,682
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,684,000
Total Project Cost
$5,368,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.