MARSHALL ROAD over MARSHALL CREEK

0.1 W CHENEY-SPOKANE · County 063, Washington · Built 2023 · 2 Lanes · 52 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089392000000000
Year Built
2023
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
52
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$154,000
Total Project Cost
$308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.