US 395 over PAHA-PACKARD RD

5.4 N JCT SR 21 · County 001, Washington · Built 1995 · 2 Lanes · 4,804 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0014489B0000000
Year Built
1995
Length
32.3 m (106 ft)
Max Span
30.8 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
4,804
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,007,000
Total Project Cost
$2,014,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.