ANDERSON RD over DRY WASH
00.29 MI N SR395 · County 001, Washington · Built 1915 · 2 Lanes · 1 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.009167, -118.530747
This bridge is in worse condition than 36.4% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 111 years old.
Nearby Bridges
ANDERSON RD over INTERMITTENT STREAM
Built 1961
PAHA-PACKARD RD over Paha Coulee
Built 2000
US 395 over PAHA-PACKARD RD
Built 1995
US 395 over PAHA-PACKARD RD
Built 1995
LIND-RALSTON RD over DRY RELIEF
Built 1967
DEWALD RD over INTERMITTENT STREAM
Built 1957
SR 21 over US 395
Built 1995
US 395 (SB ONLY) over LIND COULEE
Built 1956
SR 21 over BNRR
Built 1995
SMART RD over LIND COULEE
Built 1995
Bridge Details
- Structure #
- 084661000000000
- Year Built
- 1915
- Length
- 11.6 m (38.1 ft)
- Max Span
- 11.6 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 1
- Material
- Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $868,000
- Total Project Cost
- $1,736,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.