BAUER RD over DRY WASH
0.18 MI N LIND-RALSTON · County 001, Washington · Built 1938 · 2 Lanes · 14 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.948719, -118.461017
This bridge is in worse condition than 36.4% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 88 years old.
Nearby Bridges
LIND-RALSTON RD over INTERMITTENT STREAM
Built 1993
LIND-RALSTON RD over INTERMITTENT STREAM
Built 1993
THIEL RD over DRY WASH
Built 1916
LIND-RALSTON RD over LIND COULEE
Built 1993
LIND-RALSTON RD over INTERMITTENT STREAM
Built 1916
SUKO RD over DRY WASH
Built 1949
DEWALD RD over INTERMITTENT STREAM
Built 1957
LIND-RALSTON RD over DRY RELIEF
Built 1967
SACKMAN RD over DRY WASH
Built 1939
US 395 over PAHA-PACKARD RD
Built 1995
Bridge Details
- Structure #
- 082515000000000
- Year Built
- 1938
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 14
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $650,000
- Total Project Cost
- $1,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.