SR 202 over SR 522
JCT SR 522 · County 033, Washington · Built 1989 · 5 Lanes · 28,216 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
47.758294, -122.163903
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 37 years old.
Nearby Bridges
SR 202 over LITTLE BEAR CREEK
Built 2017
SR 202 over SAMMAMISH R
Built 2019
SR 202 over SAMMAMISH R
Built 1963
135TH AVE NE over Woodin Creek
Built 2018
SR 522 over 195TH STREET
Built 1986
SR 522 over SAMMAMISH RIVER
Built 1968
SR 522 over E-N RAMP BR
Built 1968
I-405 N-W RAMP over SAMMAMISH R I-405 SR 5
Built 1968
SR 522 RAMP over SAMMAMISH RIVER
Built 1968
I-405 over SR 522 SAMMAMISH R
Built 1968
Bridge Details
- Structure #
- 0013494A0000000
- Year Built
- 1989
- Length
- 80.8 m (265.1 ft)
- Max Span
- 43 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 5
- Daily Traffic
- 28,216
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,091,000
- Total Project Cost
- $8,182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.