SR 522 over E-N RAMP BR

1.3 E JCT SR 527 · County 033, Washington · Built 1968 · 1 Lanes · 1,285 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008382G0000000
Year Built
1968
Reconstructed
1998
Length
64 m (210 ft)
Max Span
36 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
1,285
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,596,000
Total Project Cost
$3,192,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.