SR 522 over 195TH STREET

0.8 E JCT SR 202 · County 033, Washington · Built 1986 · 4 Lanes · 26,704 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0012965A0000000
Year Built
1986
Length
53.3 m (174.9 ft)
Max Span
25.3 m
Width
26.8 m (87.9 ft)
Lanes
4
Daily Traffic
26,704
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,574,000
Total Project Cost
$7,149,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.