SR 20 over HARNEY CHANNEL

ON ORCAS ISLAND · County 055, Washington · Built 1979 · 1 Lanes · 2,150 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0013202A0000000
Year Built
1979
Reconstructed
1987
Length
32 m (105 ft)
Max Span
24.4 m
Width
6.4 m (21 ft)
Lanes
1
Daily Traffic
2,150
Material
Steel
Design
Movable - Lift
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$399,000
Total Project Cost
$798,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.