EXTENSION OF SR 20 over UPRIGHT CHANNEL
N END LOPEZ ISLAND · County 055, Washington · Built 1981 · 1 Lanes · 1,349 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.570444, -122.883611
This bridge is in worse condition than 30.8% of bridges in County 055. The average bridge in Washington is 0 years old; this one is 45 years old.
Nearby Bridges
FERRY TRAFFIC over BLIND BAY
Built 1973
FERRY TRAFFIC over BLIND BAY
Built 2004
SR 20 over HARNEY CHANNEL
Built 1979
SR 20 over HARNEY CHANNEL
Built 1959
Point Lawrence Rd over Buck Bay
Built 2011
DEER HARBOR ROAD over CROW VALLEY DRAINAGE
Built 2001
Orcas to Olga road over Cascade Creek
Built 1921
MT CONSTITUTION RD over PAUL CREEK
Built 1929
SR 20 EXTENSION over FRIDAY HBR-SAN JUAN CHAN
Built 2005
SR 20 EXTENSION over FRIDAY HBR-SAN JUAN CHAN
Built 1968
Bridge Details
- Structure #
- 0012015B0000000
- Year Built
- 1981
- Length
- 31.4 m (103 ft)
- Max Span
- 5.8 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 1
- Daily Traffic
- 1,349
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $587,000
- Total Project Cost
- $1,174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.