EXTENSION OF SR 20 over UPRIGHT CHANNEL

N END LOPEZ ISLAND · County 055, Washington · Built 1981 · 1 Lanes · 1,349 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0012015B0000000
Year Built
1981
Length
31.4 m (103 ft)
Max Span
5.8 m
Width
7.1 m (23.3 ft)
Lanes
1
Daily Traffic
1,349
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$587,000
Total Project Cost
$1,174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.