SR 20 EXTENSION over FRIDAY HBR-SAN JUAN CHAN

NE END SAN JUAN ISL · County 055, Washington · Built 1968 · 2 Lanes · 2,587 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

48.535139, -123.0145

This bridge is in worse condition than 30.8% of bridges in County 055. The average bridge in Washington is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
0008415A0000000
Year Built
1968
Reconstructed
2005
Length
42.1 m (138.1 ft)
Max Span
27.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
2,587
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$786,000
Total Project Cost
$1,573,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.