SR 527 over I-5
JCT I-5 & SR 526 · County 061, Washington · Built 1987 · 5 Lanes · 39,282 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.918258, -122.206622
This bridge is in worse condition than 50.6% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 39 years old.
Nearby Bridges
BROADWAY over SR 526 E-S RAMP
Built 1970
N-W RAMP P1 18853 over I-5 SR 527 BROADWAY AV
Built 1970
SR 526 E-N RAMP over I-5 BROADWAY AVE
Built 1995
BROADWAY AVE over I-5 TO SR 526 RAMP
Built 1970
SR 99 over I-5
Built 1963
I-5 SB TO SR 99 SB over SR 526 EB TO I-5 SB
Built 1963
SR 526 over E CASINO RD
Built 1969
75TH ST SE over I-5
Built 1966
EVERGREEN WAY over SR 526
Built 1969
112TH ST SE over I-5 NB
Built 2007
Bridge Details
- Structure #
- 0013048A0000000
- Year Built
- 1987
- Length
- 126.5 m (415 ft)
- Max Span
- 30.5 m
- Width
- 26.8 m (87.9 ft)
- Lanes
- 5
- Daily Traffic
- 39,282
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,870,000
- Total Project Cost
- $17,741,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.