BROADWAY over SR 526 E-S RAMP

JCT I-5 & SR 527 · County 061, Washington · Built 1970 · 6 Lanes · 17,375 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008707C0000000
Year Built
1970
Length
17.3 m (56.8 ft)
Max Span
15.5 m
Width
26.6 m (87.3 ft)
Lanes
6
Daily Traffic
17,375
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,079,000
Total Project Cost
$2,158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.