I-5 SB TO SR 99 SB over SR 526 EB TO I-5 SB

5.3 N JCT SR 525 · County 061, Washington · Built 1963 · 2 Lanes · 10,974 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0007116A0000000
Year Built
1963
Length
56.1 m (184.1 ft)
Max Span
21.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
10,974
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,923,000
Total Project Cost
$3,846,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.