SR 20 over HORSETAIL CREEK

16.7 E SKAGIT CO · County 073, Washington · Built 1968 · 2 Lanes · 1,322 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008465A0000000
Year Built
1968
Length
110.6 m (362.9 ft)
Max Span
54.6 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
1,322
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,931,000
Total Project Cost
$5,862,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.