SR 20 over HORSETAIL CREEK
16.7 E SKAGIT CO · County 073, Washington · Built 1968 · 2 Lanes · 1,322 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.718978, -121.069764
This bridge is in worse condition than 11.5% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 58 years old.
Nearby Bridges
ROSS DAM INTAKE over SKAGIT RIVER
Built 1940
SR 20 over THUNDER ARM BAY
Built 1961
SR 20 over LILLIAN CR
Built 1971
SR 20 over COLONIAL CREEK
Built 1961
DIABLO DAM ACCESS over SKAGIT RIVER
Built 1930
DIABLO DAM ACCESS over SKAGIT RIVER
Built 1930
DIABLO ACCESS ROAD over SKAGIT RIVER
Built 1930
DIABLO ACCESS RD over DIABLO GORGE
Built 1962
DIABLO DAM RD over DIABLO GORGE
Built 1962
DIABLO CAMP ROAD over DIABLO TAILRACE
Built 1962
Bridge Details
- Structure #
- 0008465A0000000
- Year Built
- 1968
- Length
- 110.6 m (362.9 ft)
- Max Span
- 54.6 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,322
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,931,000
- Total Project Cost
- $5,862,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.