I-90 S-W RAMP over MCCLELLAN ST BERNARD ST
1.7 E JCT US 195 · County 063, Washington · Built 1967 · 1 Lanes · 9,230 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.652889, -117.414942
This bridge is in worse condition than 81.9% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 59 years old.
Nearby Bridges
I-90 over VIADUCT STA 1396 US 2
Built 1967
I-90 S-E RAMP over DIVISION ST
Built 1967
I-90 E-N RAMP over BROWNE ST
Built 1967
I-90 W-N RAMP over HOWARD ST
Built 1967
9TH AVENUE over BEN GARNETT WAY
Built 1963
CLIFF AVENUE over BEN GARNETT WAY
Built 1969
SHERMAN ST over I-90
Built 1970
WASHINGTON STREET over S. CHANNEL SPOKANE RIVER
Built 1973
STEVENS STREET over S. CHANNEL SPOKANE RIVER
Built 1973
W-CEDAR RAMP over CITY STREET (JEFFERSON)
Built 1967
Bridge Details
- Structure #
- 0008288A0000000
- Year Built
- 1967
- Length
- 147.5 m (483.9 ft)
- Max Span
- 38.1 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 9,230
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,644,000
- Total Project Cost
- $5,288,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.